CONSTRUCTION OF THE SPORTS CENTER
Phoenix Football Academy




AT THE COMPLEX SURFACE OF 100,000 M2 WE WILL BUILD SIX FOOTBALL PITCHES, FOR WITH NATURAL AND TWO WITH ARTIFICIAL GRASS.
AT ALL FOOTBALL PITCHES THE COMPLETE DRAINAGE SYSTEM WILL BE INSTALLED AS WELL AS AUTOMATIC WATERING SYSTEM. THE MAIN PITCH WILL HAVE FLOODLIGHTS OF TOTAL POWER OF 1400-1600 LUX AND TWO AUXILIARY PITCHES 400 LUX FLOODLIGHTS EACH, ALL IN COMPLIANCE WITH THE RULES AND REGULATIONS OF “FIFA” AND “UEFA”. APART FROM FOOTBALL PITCHES, ONE TRAINING FACILITY WITH ARTIFICIAL GRASS AND ONE TENNIS COURT WILL BE BUILT.
AS FOR THE SPORTS CENTER FACILITY, IT WILL CONSIST OF FIVE SECTIONS: CENTRAL SECTION, OFFICE SECTION, ACCOMMODATION SECTION, SPORTS SERVICE AND SPORTS HALL WITH TECHNICAL SECTION, ALL IN THE AREA OF 9,500M2 OF SURFACE.
FOR THE FACILITY CONSTRUCTION PERMANENT AND TECHNOLOGICAL CUTTING-EDGE MATERIALS AND EQUIPMENT WILL BE USED AND INSTALLATION WORKS ARE THE MOST CONTEMPORARY IN TERMS OF THE QUALITY OF THE SELECTION OF THE INSTALLED EQUIPMENT.
AROUND THE WHOLE FACILITY THE TWO-LANE ROAD WILL BE DONE AS WELL AS THE PARKING SPACE FOR 140 VEHICLES AND AN INDIVIDUAL PARKING SPACE FOR BUSES. IN FRONT AND BEHIND THE FACILITY ITSELF THE PLATEAU OF PRINTED CONCRETE WAS DONE AT THE SURFACE OF OVER 3,500M2.
THE TOTAL COMPLEX WILL BE FENCED BY A PLASIC FENCE WITH THREE BIG AUTOMATIC SLIDE GATES INCORPORATED IN IT.
Help us
to achieve our goal
1. | DESIGN – architectural plan, site plan of wider environment, site plan of the construction site, facility sketch, preliminary design, final design, detailed drawings | 200.000,00 € |
2. | LAND PURCHASE – 100.000m2 – with all accompanying permits for facility construction | 100.000.000,00 € |
3. | PREPARATORY WORKS – clearance of the area, preparation of the construction site, water and electricity supply, drainage system… | 300.000,00 € |
4. | CONSTRUCTION – rough work, ground, concrete, reinforced-concrete, reinforcing, masonry, carpentry… | 35.000.000,00 € |
5. | FINAL WORKS – roof-covering, joinery, sheet metal works, room-painting, ceramic tiling, floodlight installing, natural and artificial grass placement, parking construction… | 10.000.000,00 € |
6. | INSTALLATION WORKS – heating, gas, electricity, telephone, air conditioning, pipeline, sewage system… | 2.000.000,00 € |
7. | EQUIPMENT INSTALLATION – installation of everything necessary for functioning of a space; units, devices, machines, lockers, hangers, dishwashers… | 1.000.000,00 € |
8. | INSTALLATION OF PREFABRICATED ELEMENTS – mounting products, i.e. prefabricated elements…. | 100.000,00 € |
9. | FIRE PROTECTION AND FACILITY INSURANCE – Security in case of fire, mechanical resistance and stability, protection against corrosion and outside influences… | 200.000,00 € |
10. | MAINTENANCE OF THE FACILITY IN THE FIRST YEAR OF OPERATION – maintenance of the facility refers to the measures essential for safety and mechanical resistance of the building as well as the payment of all duties during the year until the facility is profitable. | 1.200.000,00 € |
| TOTAL | 150.000.000,00€ |
Deutschland :
MEDIKO-PAN GMBH
JOHANNES-MYNSINGER-WEG 17,
89075 ULM
Deutschland
Phone: 0731/55 214 003
Fax: 0731/940 34 888
VR – Bank
IBAN: DE23630614860461656000
BIC: GENODES1LBK
Austria:
Manager – Milovan Mića Pantić
Minimaxi-Europa
Schützen Str. 24c
6020 Innsbruck
Phone: +43 (0) 664 870 84 09
Fax: +43 (0) 512 307 684